- Chiller supply, installation, addition and replacement
- Chiller plant room construction and extension
- Chilled-water (CHW) system installation and piping
- CHW pipe freezing & hot tapping for live-system modifications
- AHU replacement and modification of supply/return ductwork
- Cooling tower works, including EC-fan conversions
- Chiller pump replacement
- Electrical works supporting plant — high and low tension, control panels
Services · Applied Products
Central plant works — chillers, AHUs and chilled-water systems
Hospitals and data centres can't switch off to let you work.
What we do
Plant replacement in live buildings
Our chiller and CHW teams replace and extend central plant in live environments — chiller additions and replacements, AHU replacements, chilled-water piping, pipe freezing and hot tapping — sequenced so the building keeps running.
Twenty-five installers and technicians across the two teams, with electrical works carried out under our own ME05 registration rather than passed to a third party.
Scope
What's included
Proof points
Recent plant works
Recent works
- Alexandra Hospital — Chiller Addition & Replacement
- Alexandra Hospital — AHU Replacement
- Equinix — Cooling Tower EC-Fan Conversion
Tell us about the building
Send drawings or a short brief and we'll come back with a site walk-through and a considered proposal.